Project Highlights
We are honored to collaborate with this leading Russian distillery, supplying a complete whisky production system, including:


1. Malt Handling System
- 1000KG/H Malt Crusher
- 1000KG/H Conveyor


2. Mashing System
- 4000L Mash Tun & Lauter Tun
- 6000L Hot Water Tank
- Plate Heat Exchanger (20+20㎡)
- Stainless Steel Platform & Control Panel


3. Fermentation System
- 7 x 6300L Fermentation Tanks
- 3.0KW Transfer Pumps
- Food-Grade Hoses & Fermentation Control Panel


4. Distillation System
- 6000L Whisky Pot Still (with Explosion-Proof Stirrer)
- 3600L Whisky Rectifier
- Alcohol Safety System & Collection Tanks
- Stainless Steel Operation Platform
- PLC Control Panel


5. Cooling System for Fermentation Tanks
- 40HP Chiller Unit
- 8000L Cooling Water Tank
- 3KW Cooling Pump


6. Piping & Electrical Installation
- Full pipeline and valve connections for mashing, distillation, and cooling systems
- Wiring, signal cables, and drainage components



Next Steps: Final Inspection & Delivery
Production is proceeding smoothly, and we anticipate completion by the end of this month. We look forward to the client's inspection and are confident that our high-quality equipment will meet their expectations.
This project marks a significant milestone in our international cooperation, and we are excited about the potential for long-term collaboration with our Russian partner.
Stay tuned for further updates!











